10 free hours of engineering. · 1-hour scoping call up front — we'll start this week.Claim hours →
Energy & Utilities
ENG
What we build for energy

Six places we usually start.

01

Field service & crew apps

Job dispatch, asset capture, GPS tracking, offline-capable forms. Built for trucks, not desks.

02

Asset management overlays

Custom logic on top of Maximo, Cascade, Ventyx. Predictive maintenance, RUL, run-to-failure analytics.

03

SCADA / DER integrations

Read-only dashboards on top of OSI Monarch, OpenADR, OSIsoft PI. DER fleet-level optimization layered in.

04

Customer & rate-payer portals

Usage visualization, outage status, billing, demand-response opt-in. White-labeled per utility.

05

Regulatory & reliability reporting

FERC, NERC, EIA, state PUC. Numbers that tie back to your SCADA history on demand.

06

Outage & restoration management

Crew assignment, ETR calculations, customer comms, post-event reporting. Tested against actual storm patterns.

Remote monitoring

Substations, solar sites, and field assets — on one live dashboard.

The DataVisions Bridge streams telemetry from remote equipment over a single outbound, encrypted connection — no inbound ports, no VPN. Watch every site from a browser.

Systems we plug into

Your stack, not a green field.

Most engagements start by integrating with what you already run. The systems below are ones we've shipped against in this vertical — not a marketing list.

Maximo / Cascade / Ventyx
OSIsoft PI / GE Proficy
ArcGIS
SAP / Oracle Customer Care
AMI head-ends (Itron / Landis+Gyr)
OpenADR
Compliance & regulation

What we build to, by default.

These are the constraints your industry lives with. We treat them as guardrails from week one — not a Phase 5 panic.

01NERC CIP
02FERC reporting
03ICS / IEC 62443
04State PUC requirements
How a typical engagement runs

Three phases, applied to your world.

Same model as every DataVisions engagement — tuned for the rhythms of energy & utilities.

01Discovery & Requirements

Week 1: Walk a crew day, a control-room day, and a regulatory cycle. Find the slowest hand-off.

02Implementation & Testing

Weeks 2–6: Build against a sandbox PI / Maximo. Air-gap testing if grid-side.

03Go Live & Support

Week 7: Pilot with one region or one feeder. Stabilize, then expand.

Integrations · Energy & Utilities

Built to plug into the tools you already run

We connect custom energy and solar software to the hardware and data sources that run your operation — Enphase, SolarEdge, and Aurora Solar for solar, plus Green Button and UtilityAPI for utility data — so you own the platform without rebuilding the ecosystem.

Don’t see your tool? If it has an API, we integrate with it — and you own the connection.  Ask about your stack →

Other industries we serve

Adjacent verticals.

MFGManufacturing & IndustrialHEAHealthcare & Life SciencesFINFinancial ServicesRETRetail & E-CommerceLOGLogistics & Supply ChainHSPHospitality & HotelsSee all industries